(Issued on July 13, 2007)
Section 1 (table of contents)
Business Practices
Section 2
IX. Studies
a. Studies for Local Service
The Company performs local system and interconnection studies under Schedule 21of the ISO-NE OATT. Studies performed either by the Company for service under this schedule or on behalf of the ISO are listed at:
http://www.velco.com/Templates/default.asp?pageId=2
ISO-NE performs regional system studies that can be found at:
http://www.iso-ne.com/trans/rsp/index.html
b. Generator Interconnection Studies
ISO-NE administers interconnection studies in accordance with Schedule 22 and Schedule 23of the ISO-NE OATT. A list of these studies can be found at: http://www.iso-ne.com/genrtion_resrcs/nwgen_inter/status/index.html