Rates, Tariffs, & Business Practices

  • Business Practices
    • Applicable Schedules
    • Ancillary Services
    • OASIS
    • Designation of Network Resources
    • General Terms & Conditions
    • Studies for Local Service
    • Procedures for Arranging Transmission Service
    • Rates
  • Access to Critical Energy Infrastructure Information
  • Financial Information
  • Home >
  • Rates, Tariffs, & Business Practices >
  • Business Practices >
  • Applicable Schedules

Applicable Schedules

Services applicable to these procedures

Schedule 21 of the ISO OATT contains the terms and conditions that are common for all local transmission services that are provided by the Participating Transmission Owners. Schedule 21-VTRANSCO contains the company’s specific rates, terms and conditions for Local Service provided over the transmission facilities located within Company’s service area. The company offers Local Point-to-Point, both firm and non-firm, Network Service and Ancillary Service.

Click here for the cost of transmission and Schedule 1 load and dispatch for Vermont Transco's Open Access Transmission Tariff (Local Network Service), which is updated monthly.

Additional services provided under the ISO-NE tariff

The ISO-NE OATT contains the terms and conditions for regional transmission services over the Pool Transmission Facilities that are provided by ISO-NE. Transmission customers interested in obtaining any of the services offered over these facilities should refer to Schedules 8 and 9 of the ISO-NE OATT.

Additionally, generators interested in interconnecting to the regional transmission system should refer to Schedule 22 or Schedule 23 of the ISO-NE OATT, which contains the terms and conditions that are common for all large generator interconnection services that are provided by the PTOs.

Issued on July 13, 2007

Vermont Transco
  • Home
  • Interconnection
    • How to Apply for Service
    • Facility Connection Requirements
    • Transmission Studies
    • LSS Agreements
  • Rates, Tariffs, & Business Practices
    • Business Practices
    • Access to Critical Energy Infrastructure Information
    • Financial Information
  • Regulatory Requirements
    • FERC Order 890
    • Standards of Conduct
    • ATC & TTC
  • Contact

Terms of Use | Site Map

© 2013 - 2019 VELCO/Vermont Transco LLC, 366 Pinnacle Ridge Rd, Rutland, VT